37

within the temporary casing

- structure or foundation

of

ent

rich Portland Cement Concrete, deposited in mass, should be laid to a horizontal bed to just above low water mark, and finished with a surface to receive the Granite Ashlar intended to form the face of the Wall.

The making of the courses of the Granite Ashlar of uniform thicknesses and lengths throughout the face would, I consider, be equally good, and certainly less expensive, if the same courses were adopted and in the blocks comprising the work.

Moreover, it would be better if the blocks were laid "header and stretcher" in alternate courses, rather than in the manner shown on the Section.

I am not aware whether the Wall, or any part of its length, cut hereafter, would be subject to Craft lying alongside of it, in a position to judge whether the action.

I am not sure it might not be advantageous to construct the superstructure of this Wall with Concrete blocks formed "in situ", both instead of with Granite Ashlars partly in Granite face.

I would recommend the omission of the iron cramps and the so-called "dovetailing" of the Coping, substituting grout-nicks in the lower courses, and diagonal joggles for the coping course.

I cannot ascertain from the papers whether there would be any material interference with the Roadway if the Wall were raised to a greater height above high water mark than is now proposed, viz. 1ft 6ins; this want of height would seem to jeopardize the safety of the Wall.

The Coating of Concrete should extend back for a width of not less than 25 feet from the front edge of the Coping, and should abut solidly against the back of the Coping Course -- not tapered off as shown; the top of the coping should be "weathered" off to correspond with the slope of the Concrete surface.

If the "rocky bottom" on which the wall is to be founded is sound throughout its length, I see no advantage - but rather otherwise - in placing boulders at the toe of the wall, or founding it in the manner I have hereinbefore recommended.

With respect to those portions of the sea frontage along which there is reason to believe that future reclamations will be made in consequence of the anticipated silting up of the foreshore,

where it has been proposed to repair the existing Walls, I regret that the information at present available here is quite insufficient to enable me to suggest any equally efficient and less costly method for effecting the desired object so far as regards this portion of the work than that proposed by the Surveyor General.

Edit History

2026-05-21 05:35:41 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
37 within the temporary casing - structure or foundation of ent rich Portland Cement Concrete, deposited in mass, should be laid to a horizontal bed to just above low water mark, and finished with a surface to receive the Granite Ashlar intended to form the face of the Wall. The making of the courses of the Granite Ashlar of uniform thicknesses and lengths throughout the face would, I consider, be equally good, and certainly less expensive, if the same courses were adopted and in the blocks comprising the work. Moreover, it would be better if the blocks were laid "header and stretcher" in alternate courses, rather than in the manner shown on the Section. I am not aware whether the Wall, or any part of its length, cut hereafter, would be subject to Craft lying alongside of it, in a position to judge whether the action. I am not sure it might not be advantageous to construct the superstructure of this Wall with Concrete blocks formed "in situ", both instead of with Granite Ashlars partly in Granite face. I would recommend the omission of the iron cramps and the so-called "dovetailing" of the Coping, substituting grout-nicks in the lower courses, and diagonal joggles for the coping course. I cannot ascertain from the papers whether there would be any material interference with the Roadway if the Wall were raised to a greater height above high water mark than is now proposed, viz. 1ft 6ins; this want of height would seem to jeopardize the safety of the Wall. The Coating of Concrete should extend back for a width of not less than 25 feet from the front edge of the Coping, and should abut solidly against the back of the Coping Course -- not tapered off as shown; the top of the coping should be "weathered" off to correspond with the slope of the Concrete surface. If the "rocky bottom" on which the wall is to be founded is sound throughout its length, I see no advantage - but rather otherwise - in placing boulders at the toe of the wall, or founding it in the manner I have hereinbefore recommended. With respect to those portions of the sea frontage along which there is reason to believe that future reclamations will be made in consequence of the anticipated silting up of the foreshore, where it has been proposed to repair the existing Walls, I regret that the information at present available here is quite insufficient to enable me to suggest any equally efficient and less costly method for effecting the desired object so far as regards this portion of the work than that proposed by the Surveyor General.
Baseline (Original)
37 within the temporary casing - shucture or foundation of ہے تو ent rich Portlana Cervent Concrete, deposited in mass, should AL at bed to horizontal be raind to just above low water mark, and finished with receive the Granite Ashlar intended to form the face of the Wall. in в Bee го advantage, but the contrary. making the courses of the Granite Ashlar of uniform thickneses langths Grz and q the the face, throughout. would. I corsider, be Carne The Work equally good, and... reasonable Amort in the Certainly left expensive, if of variation of prizes different the same Cornses Courso CH were adopted and in the blocks comprising Mneover it would better if the blocks were laid el kuoron as ni be α the "header and shotcher" in alternate courses, rather than in the manner chevr on the Section. aw not aware whether the tale. any part of its length cut hereafter, would be subject to Craft lying alongside of it, position to Fudge whether kine, now the action. 120 arr I in a. it might not be avery vuoro étonnuċuti to constuct the superstructure of this Vale with Concrete blocks formed. موع Concrete vrate "in situ, both instead rishad of with ou ad langs". Achtars" Gr partly in Granite face. would recommend the omission of the iron cramps and the Ro called "dovetailing" of the Coping, substituting grout-nicks grout - nicks the lower courses, For andy whole depth diagonal joggles for the coping Course! I cannot ascertain from the papers whether there would be army material interference with the Roadway if the Wall were raised to a greater height above high water mark than is now proposed, viz. Itt gins; this want of height would seem safety of the Wall- to mo св to jeopardize the any cate the Coating of Concrete should extend back Jor a width of not less than 25 feet from the front edge of the Coping, and should abres solidly against the back the Cofiring Course -- not tapered off as shown the top of the coping should be " weathered" off to correspond with the slope off. the Concrete surfald. $2.0 of If the "rocky bottoon" on which the wall is to be founded sound throughout its length, I see advoustage - but rather otherwise _ in placing boulders at the 10e of the wall of founded the manner I have hereinbefore recommended. With respect to those portions of the sea fcontago along which there is to believe that future xxxy ber reason reclamations made in Consegue. the anticipated silting up of of the foreshore, 117 where it has been proposed to repair the cxisting Walls, I regret that the information at frecent available here is quite insufficient to enable tire to- Gray coletler arro de lef costly desired object Curr any equally efficient oud be deviscol for effecting the so far as tegarði this portion of the work than that proposed by the Surveyor Gener al i
2026-05-21 05:35:41 · Baseline
View content

37

within the temporary casing

- shucture or foundation

of

ہے تو

ent

rich Portlana

Cervent Concrete, deposited in mass, should

AL

at bed

to

horizontal

be raind

to just above low water mark, and finished with receive the Granite Ashlar intended to form

the face of the Wall.

in

в

Bee

го

advantage, but the contrary. making the courses of the Granite Ashlar of uniform thickneses langths

Grz

and

q

the

the face, throughout. would. I corsider, be

Carne

The Work

equally good, and...

reasonable Amort

in the

Certainly left expensive, if

of variation of prizes different

the same

Cornses

Courso

CH

were adopted

and in the blocks comprising

Mneover it would

better if the blocks were laid

el

kuoron as

ni

be

α

the "header and shotcher" in alternate courses, rather than in the manner chevr

on the Section.

aw not aware

whether the tale. any part of its length cut

hereafter, would be subject to Craft lying alongside of it,

position to

Fudge whether

kine, now

the action.

120

arr

I in

a.

it might not be

avery

vuoro étonnuċuti

to

constuct the superstructure of this Vale

with Concrete blocks formed.

موع

Concrete vrate "in situ,

both instead

rishad of with

ou

ad

langs". Achtars"

Gr

partly in

Granite face.

would recommend the omission of

the iron cramps and the

Ro

called

"dovetailing" of the Coping, substituting

grout-nicks

grout - nicks

the lower courses, For

andy

whole depth diagonal joggles for the coping

Course!

I cannot ascertain from the papers

whether there would be

army

material interference

with the Roadway if the Wall were raised to a greater height above high water mark than is now proposed, viz. Itt gins; this want of height would seem

safety of the Wall-

to

mo

св

to jeopardize the any cate the Coating

of Concrete should extend back

Jor

a width of not less than 25 feet from the front edge

of

the Coping, and should abres solidly against the back the

Cofiring Course --

not tapered off as shown the top of the coping should be " weathered" off to correspond with the slope off. the Concrete surfald.

$2.0

of

If the "rocky bottoon" on which the wall is to be founded sound throughout its length, I see

advoustage - but rather otherwise _ in placing boulders at the 10e of the wall of founded the manner I have hereinbefore recommended.

With respect to those portions of the sea fcontago along which there is

to believe that future

xxxy

ber

reason

reclamations

made in Consegue. the anticipated silting up of

of

the foreshore,

117

where it has been proposed to repair the cxisting Walls, I regret that the information at frecent available here is quite insufficient to enable

tire

to-

Gray

coletler

arro de

lef costly desired object

Curr

any equally efficient oud be deviscol for effecting the so far as tegarði

this

portion of

the work than that proposed by the Surveyor

Gener

al

i

Comments